Slow down, stop texting at construction zones this summer - Action News
Home WebMail Thursday, November 14, 2024, 11:06 PM | Calgary | -3.8°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
British Columbia

Slow down, stop texting at construction zones this summer

As summer approaches and roadside work increases, a coalition of roadside workers, construction companies, emergency responders and government agencies is gearing up the "Cone Zone" campaign, reminding drivers to pay attention and proceed safely through construction zones.

Speeding, distracted drivers big dangers for road workers

Flag person Heather Guy says she smiles at drivers to help reduce frustration as they go through a construction zone. (Michelle Eliot, CBC )

As summer approaches and roadside work increases, a coalition of roadside workers, construction companies, emergency response teams and government agencies is gearing up the "Cone Zone" campaign, reminding drivers to pay attention and proceed safely through construction zones.

Karesse Glover, co-owner of Traffic Pro Services, stands in front of a construction zone in Burnaby. (Michelle Eliot, CBC )

"We are at quite a high risk from the driver when there is an accident or vehicular hazard," says Karesse Glover, a former flagger, or traffic control person, who now co-owns Coquitlam-based Traffic Pro Services.

"We're talking about creating a partnership with the driver that allows the driver to see us and react to us in time, so we can go home safe to our families."

Between 2004 and 2013, 239 roadside worker motor vehicle incidents were reported to WorkSafeBC, and 15 resulted in a fatality. Glover says population increases and new technology pose unprecedented challenges for traffic control workers.

Drivers on cell phones while waiting

In May Coquitlam RCMP conducted a traffic enforcement campaign along Pinetree Way near Lougheed Highway, near construction for the Evergreen rapid transit line.

More than 1,100 tickets were issued, says Cpl. Jamie Chung. Thirteen per cent were for speeding, 30 per cent were for unsafe driving, while 20 per cent were for distracted driving.

RCMP Corporal Jamie Chung says many drivers fail to stop at a crosswalk along Lougheed Highway in Coquitlam, which has been relocated due to construction (Michelle Eliot, CBC )

"We think part of the reason is because it's stop and go traffic. And when people are stopping, they pull out their cell phone, they check their message, they reply to emails, which is basically a no-no," says Cpl. Chung.

New traffic conditions on Pinetree Way include reduced lanes, new crosswalk locations and restrictions on turning right at red lights. RCMP are also handing out information leaflets to reduce confusion.

Glover says proper signage that is easily visible and gives advanced warning are ways to reduce driver confusion and prevent hazardous behaviour.

Inconsistency confuses drivers

But Glover is concerned inconsistency among construction zones, which are set up by an array traffic control companies, also leaves drivers confused.

Kingsway and Willingdon in Burnaby, BC, is the site of ongoing roadwork (Michelle Eliot, CBC )

"When we do have uniformity, the driver learns how to respond, because they see the same thing. Right now, the drivers are encountering a number of different situations, and then coming to the next site and being confused all over again."

The B.C. Construction Alliance is currently updating a traffic control safety course, and safety at construction projects are overseen by WorksafeBC and municipal governments.

The B.C. Ministry of Transportation requires consistency among work sites, but there is no regulatory body to ensure common standards.

Relationship with drivers crucial

While encounters between drivers and traffic control workers can, at times, become antagonistic, Glover says her industry has taken a new approach, focusing on strengthening the relationship by giving clear direction to drivers and reducing the chance for conflict.

Traffic is slow along Pinetree Way in Coquitlam, near construction of the Evergreen Rapid Transit Line. (Michelle Eliot, CBC )

"We understand that they're being delayed, and try to accommodate them in a timely fashion. A clear response comes from clear direction. A confused response comes from lack of direction"

Catch Michelle Eliot with On the Move, a segment on commuter issues, Tuesdays at 6:50 on The Early Edition, CBC Radio 1, 88.1 FM / 690 AM in Vancouver