How Canada's largest solar farm is changing Alberta's landscape - Action News
Home WebMail Sunday, November 10, 2024, 07:43 PM | Calgary | 0.9°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Calgary

How Canada's largest solar farm is changing Alberta's landscape

The largest solar project in the country will have 1.3 million solar panels over 3,300 acres of farmland. When it's done, it will put enough electricity directly in to the grid to power the equivalent of 150,000 homes.

Project the size of 1,600 football fields is making Alberta a leader in green energy

Row upon row of solar panels gleam under the sun shining down from a clear sky.
The Travers Solar Project, the largest solar farm in Canada, is under construction in Lomond, Alta. (Carolyn Dunn/CBC)

Ourplanetischanging. So isourjournalism. This story is part of a CBC News initiative entitledOurChangingPlanetto show and explain the effects of climatechangeand what is being done about it.


What's most stunning about the Travers Solar Project is its size.

Imagine a seemingly endless prairie wheat or canola field. Exceptthis landis filled with steel piles:228,000 of them, when the last one is finally driven into the ground.

A kilometre or so down a service road in Lomond, Alta.,in Vulcan County, the next phase of construction is taking shape:row upon row of black solar panels, already tilting at the sun.

Dan Balaban isthe CEO of Greengate Power, the company developing themassive project.He'soverwhelmed by the progress, saying that standing among the panels is a very different experience than seeing it in a virtual reality model.

He's emotional, he says, to"actually see an idea that we conceived almost five years ago now turn into reality."

When complete, thenearly 3,300 acres (1,335 ha) of land will be covered in 1.3 million solar panels, each one of them 1.2 by1.8 metres in size.A member of the GreengatePower team crunches the numbers on his smartphone and estimates the finalized project will be roughly equivalent to 1,600 Canadian Football League fields or more than five square miles.

The project will produce enough electricity to power 150,000 homes, provide much-needed jobs and investment in the area, and exploit Alberta's renewable resources a timely endeavour given the increased demand for green energy, and a globalpriority as world leaders gather in Glasgow for the 2021 United Nations Climate Change Conference (COP26).

The Conference of Parties (COP), as it's known, meets every year and is the global decision-making body set up to implement theUnited Nations Framework Convention on Climate Change, adopted in the early 1990s, and subsequent climate agreements.

"We need to move beyond talking about solutions. And I'm really proud that our companyishelping create real, clean electrons. We need more projects like this," Balaban said.

Canada's largest solar project attracts investors

The Travers Solar Project will be the largest solar farmto date in Canada.Currently, the largest solar farms are both in Ontario: the Sol-Luce Kingston project and Grand Renewable Energy Park, eachwitha capacity of 100 megawatts, according to Natural Resources Canada's most recent information.

It is no small part in why Alberta is leading renewable energy growth in the country. This one project essentially doubles the province's solar capacity.

That achievementhasn't come cheap. Copenhagen Infrastructure Partners, one of the world's largest renewable energy investment firms,has put up the entire cost of $700 millionto make the project a reality its first funding in the Canadian market.

This substation will take energy from 1.3 million solar panels and put electricity directly into Alberta's electric grid. (Carolyn Dunn/CBC)

Online sales giant Amazon was ready and waiting to buy all the electricity the solar farm can harvest in its effortto reduce its company emissions (although it has not yet revealed which facility it will be powering). For the record, that's 465 megawatts of alternating currents (MWac),Ithink this is really fantastic," said Balaban, who has been developing renewable energy projects for 15 years.

Increased demand for green energy

There's a growing demand for electricity generated by renewable resources by corporations like Amazon. Both governments and consumers are demanding companies reduce emissions and reduce their environmental footprint.

In Alberta, the conditions for a transition torenewable energy sources are ripe, says Darren Christie, the chief economist for the Canada Energy Regulator.

"There's a real concerted effort in the province to phase out the existing coal generation, and that's really created a window of opportunity for all other sorts of power, but very particularly wind and solar," he said.

A host of other factorsmake southern Alberta arguably the most appealing place in North America for renewable energy projects.

Alberta's energy market is deregulated. While that has a mixed record when it comes to consumers, there is no question it makes private investment easier, said BlakeShaffer, an assistant professor in the University of Calgary's department of economics.

And given the current increased demand for green energy, there's even more motivation for investors to fund these kinds of projects, he said.

"Most of Canada is government-owned utilities, but here, if you and I had enough money, we could go and build utility-scale generation and connect it to the grid," Shaffer said.

That's precisely what Greengate Power has done.

Butall the deregulation in the world wouldn't make a project investment-worthy without a bankable resource. In this case, it's the sun.

WATCH | How an Alberta community is struggling with a transition to green energy:

Wind turbine project boom divides Alberta community

4 years ago
Duration 6:24
Wind energy projects are being built rapidly in Western Canada. CBC The National looks at one community struggling to come to a consensus on the transition to green energy.

Southern prairie sunbelt

With about 320 sunny days each year, southern Alberta and Saskatchewan are known as Canada's sunbelt.

And the TraversSolar Project'spanels tilt to make the most of every minute of that sun, explained Daryl Campbell, the site supervisor from PCLConstruction, thecompany contracted to buildthe site."In the morning, the panels will face towardthe east, and as the sun slowly moves across the sky, it'll track the sun," he said.

The panels are bi-facial, or double-sided, too. So, in the winter the sun will reflect off the snow andinto the solar panel, pumping electricity into the power grid.

The solar panels on the Travers Solar Project are double-sided. So in winter, they will reflect the sun from the snow on the ground into the panels, as well as warm the panel to stop snow from accumulating on the top. (Carolyn Dunn/CBC)

Concern about landscape and use of farmland

Not everyone is thrilled with the renewable energy projects in these parts, however. The proliferation of windmills and this new solar project are changing the look of the prairie landscape.

Vulcan County ReeveJason Schneider says one of the biggest concerns he hears from locals is that the mega-project and others coming to the area soon will gobble up too much agricultural land.

Vulcan County steers the companies to the least productive land,Schneider said.

But on the other hand, after a devastating downturn in the oil and gas industry in the area, he says being a hub for renewable energyis powering some hope for the future.

In recent years, failing and insolvent oil and gas companies walked away from their tax bills, leaving Vulcan County$8 millionin the hole. That'sequivalent to $2,000 for every resident.

Investment and jobs welcome after oil and gas downturn

So, Schneider is keen to put tough times in the past and refill the tax coffers with money from renewable energy companies. "It's investment, it's development, it's jobs. So, hey, we will take it."

A worker drills one of 1.3 million solar panels that will be installed at the Travers Solar Project in Lomond. (Carolyn Dunn/CBC)

One of the 580 people working on site now is Devon Bearhat, a member of the nearby Siksika Nation.

"A lot of these people that I've gotten this employment opportunity [with],they're really struggling to find work elsewhere," he said.

Bearhat took a break from studying for his bachelor of science in construction management for thisjob and the experience that comes with it. "It's something that's going to be under my belt for the rest of my life," he said.

The Travers Solar Project will employ another 250 people as more supplies arrive to further ramp up construction. Only 10 people will be employed full time once construction of the solar farm is done.

The project is scheduled to be completed by the end of next year.