Burlington Canal Lift Bridge reopens after 2 months of maintenance work - Action News
Home WebMail Thursday, November 21, 2024, 01:42 PM | Calgary | -10.1°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
Hamilton

Burlington Canal Lift Bridge reopens after 2 months of maintenance work

The Burlington Canal Lift Bridge on Eastport Drive reopenedMonday after being closed for over two months.

Around The Bay Road Race crosses bridge at 15 km mark and is set to take place on March 26

A bridge.
A ship makes its way under the Burlington Canal Lift Bridge on May 20, 2019. (Dan Taekema/CBC)

The Burlington Canal Lift Bridge on Eastport Drive reopenedMonday after being closed for over two months.

The road was closed on Jan. 5 for maintenance work whilepedestrian and cyclist pathways were closed since Dec. 28.

The work is part of a long-term federal projectto expand the bridge's lifespan by roughly 30 years for the approaches and 50 years for the deck and sidewalk.

The specific changes include replacing the lift span deck, rehabilitating the approach spans and widening the sidewalk.

More work is set to start this winter and is slated to be completedbetween next summer and winter 2024.

The Around The Bay Road Race, which crosses the bridge about half way through the 30 kilometrerace, is set to take place on March 26.