Home | WebMail | Register or Login

      Calgary | Regions | Local Traffic Report | Advertise on Action News | Contact

Manitoba

Winnipeg's southwest rapid transit corridor expansion cost drops $120M

The projected cost of extending Winnipeg's southwest rapid transit corridor has shrunk by $120 million.
Construction to expand Winnipeg's rapid transit corridor from Jubilee Avenue to the University of Manitoba will begin this summer. It will be ready for use in April 2020. (Gary Solilak/CBC)

The projected cost of extending Winnipeg'ssouthwest rapid transit corridor has shrunk by $120 million.

The savings were realized through some changes to the final design and a competitive bidding process, city officials said, addingthe project was also advertised during "very favourable market conditions" that included lower interest rates and a lowervolume of work in the national marketplace.

Construction of the extension will begin this summer, with Plenary Roads Winnipeg heading up the $467.3-million project.

The existing southwest rapid transitcorridorruns from downtown to Jubilee Avenue and Pembina Highway.The extension will add7.6 kilometres, from Jubilee to the University of Manitoba.

The project is expected to be completed in late 2019 and will then go through a period of testing as well as training of drivers.

Transit operations on the new corridorare expected to begin in April 2020.