Home | WebMail | Register or Login

      Calgary | Regions | Local Traffic Report | Advertise on Action News | Contact

Sign Up

Sign Up

Please fill this form to create an account.

Already have an account? Login here.

Montreal

Major construction, roadwork unveiled for next 10 years

The City of Montreal has unveiled its plan to deal with its vast infrastructure needs over the next 10 years.

Study shows some city roads, water system do not meet an acceptable level of service

The city says work will also likely have an impact on people's ability to get around Montreal.

Montreal Mayor Denis Coderre has unveiled the city's plan to deal with its vast infrastructure needs over the next 10 years and Montrealers can expect to see more work on roads, sewers and the water system.

A recent study by the city found that 22 per centofsewers, 14 per centof the water system and 45 per centof roads do not meet an acceptable level of service.

Montreal expects to have completed work on about 295 kilometres of roads, aqueducts and sewers by the end of this year, but the city plans to tacklemore crumbling infrastructureevery year starting in2017.

But downtown Montreal will get a break for next year's375th anniversary after Coderre vowed that no construction will be carried out in the sector except for emergency repairs.

More traffic chaos

There will be a dramatic increase in work starting in 2017,when the city will take try to complete work and repairs on676 kilometres of infrastructureeach year.

The construction plansare expected to cost $702 million per year,an increase of 89 per cent from 2016.

The new work will also likely have an impact on current construction and people's ability to get around the city.

City administrators say they willtry to minimize that impact on motorists and residents as best as they can.

A better water system

The city says that as a result of work carried out on sewers and aqueducts over the last 10 years, Montreal has had to produce less drinking water to make up for lost water through leaking pipes.

The city is obliged to present five-year infrastructure plans to the ministry of municipal affairs if it wants to receive grants for work on its water system.

Since 2006, Montreal has received about $1 billion in grants.

With files from Elias Abboud