Home | WebMail |

      Calgary | Regions | Local Traffic Report | Advertise on Action News | Contact

Montreal

Turcot Interchange work on schedule, but drivers face peak traffic diversions

The Transport Ministry is setting up 28 temporary detours as ramps get torn down and rebuilt.

The Transport Ministry is setting up 28 temporary detours as ramps get torn down and rebuilt

An aerial image of the Turcot interchange as of Oct. 19. (airphotomax.com)

Quebec Transport MinisterAndrFortinsays construction on the Turcot Interchange is on schedule and on budget, but that drivers are in for the worst of the traffic headaches.

With 56 per cent of the project done, commuters are still in for another two years of detours as the point of peak traffic diversion is now kicking in.

The Transport Ministryis setting up 28 temporary detours as ramps get torn down and rebuilt.

MayorValriePlantevisited the siteon Monday, saying that she's pleased with the progress so far.

"The fact that it's on target, it's good news," said Plante.

Montreal Mayor Valrie Plante and provincial Transport Minister Andr Fortin toured the site, Monday. (CBC)

Green walkwayback on the table

She also revived the idea ofa pedestrian and cycling bridge connecting theNotre-Dame-de-Grceand Southwest boroughs known as theDalle-Parc.

The greenwalkway was included in the initial Turcot plans but later axed by the province as too expensive.

In theory,the addition would facilitate travel between the Lachine canal and NDGvia the St-Jacques escarpment, nearthe southern end ofCavendishBoulevard.

It was a big selling point for residents during the initial consultations, and it has come up multiple times since it was quietly removed from the plans by the Transport Ministry more than two years ago.

Plante says she's been working with the minister and that she's hopeful the Dalle-Parc project isn't dead for good.

"The fact that we don't have anything to connect both neighbourhoods and to support active transport is a problem and we both agree on that," she said.

For his part, Fortinsays he's willing to consider bringing the project back but that it likely wouldn't happen until after the Turcot is completed.

"We agreed to work with the citizens south of the highway and north of the highway to see exactly what they want," he said. "It's a shared vision we have with the city."

Before and after: a look at Turcot interchange construction progress

7 years ago
Duration 0:30
Work on the Turcot interchange is now 60 per cent done. Here's a look at some of the progress so far.

With files from Simon Nakonechny