Home | WebMail |

      Calgary | Regions | Local Traffic Report | Advertise on Action News | Contact

Montreal

What we know about the problems with the AZUR Metro cars

Montreal's public transit agency has decided to temporarily pull all 12 of the new AZUR trains from service pending an investigation into the incident. Here's what you need to know.

AZUR trains pulled out of circulation as STM investigates cause of Saturday shutdown

The STM released images of the damaged contact shoe, the part of the train that touches the rail and electrifies it. (CBC)

The rollout of Montreal's new Metro cars has been stopped in its tracks, literally, following a weekend malfunction on the Orangeline.

On Monday,theSTM, Montreal's public transit agency,saidthey've decided totemporarily pullall 12 of the newAZURtrains from service pending an investigation into the incident.

Here's what you need to know.

What happened?

The STM says that signaling equipment at the Du CollgeMetro station was severely damaged when a train passed through Saturday afternoon.

So severe was the damage that it caused a 10-hour shutdown of parts of the Orange line. It required urgent repairs to the track, andSTM crews managed to restore service by Sunday morning.

According to the STM'sreport, "an investigation is currently underway to determine whether the damages stem from a fault in the interface between trains and tracks."

The STM released photos of the damaged contact shoe, inductive coilsandgaugerods.

Are the new AZUR cars to blame?

PhilippeSchnobb, the chairman of the STM, told CBC's Homerun that inspection crews realized there was a problem with the contact shoe in December, but they didn't know exactly why or where.

He specified that the issue was not something specific to theAZUR cars, but that the effect of the problematic contact shoe was "worse" for the AZUR than the older Metro cars.

He explained that the STM plans to attach cameras to the underside of the cars, in order to pinpoint exactly where the contact shoe is malfunctioning.

He said these routine inspections take place every four to six weeks.

Inductive coils were damaged as an AZUR train passed through a station, resulting in a 10-hour shutdown. (Submitted by STM)

How will this affect the rollout ofAZUR cars?

Atotal of 52AZURtrains are supposed to be brought into service by 2018 andSchnobbsays he's "confident" that they will make that deadline.

But this is not the first problem to surface in connection with the new cars.

Initially they were promised for 2014, but some Metro tunnels had to be widened in order to accommodate the bigger cars.

There was a further delay when Bombardier said in January 2015 that Alstom, its supplier, hadn't been able to deliver a key software component.

After months of delays,the AZUR trains were first put into service last February.

Then threeAZURtrains werepulled out of service in Juneafter a crack was found ina nut holding together onetrain'ssuspension system.

How angry should commuters be?

The STM says these kinds of mechanical issues are expected when it comes to phasing in a new fleet of cars.

Schnobbtold reporters Monday that this "this happens everywhere in the world. And in some cities, it's much worse than what happened here."

MayorDenisCoderreechoed these reassurances, saying that the city's Metro system has faced these kinds of issues before.

"The first MR-73, they had their issues too. Or the MR-65 the first time, because it was the first time ever that we had the Metro,"Coderre said.

Montreal Mayor Denis Coderre and Philippe Schnobb, the chairman of the STM, spoke with reporters Monday. (CBC)

Is it Bombardier's fault?

Schnobb and the STM aren't willing to get into the "hypotheticals" of whether the issuelies with the AZUR cars, which we are made by a Bombardier-Alstomconsortium.

"The assumption is that the problem is on the track, not on the train," Schnobb told CBC.

The$1.2-billion contract to replace Montreal's aging fleet of cars was awarded to Bombardier without a public tender in2006.

The French-owned companyAlstomlater arguedit should be allowed to compete for the lucrative contract as well, and two years later a Quebec Superior Court judge ruled in the company's favour, enabling it to bid on the contract.

Bombardier andAlstomwent on to form a consortium in 2010, building a factory inLaPocatire, Que.

Red streetcar on Spadina Avenue.
The new Bombardier streetcars in Toronto are experiencing mechanical problems more often than expected, according to a TTC staff report. (David Donnelly/CBC)
Bombardier has built transit vehicles around the world, but recent customers have expressed displeasure with its product.

Toronto's transit agency wants to cancel itsnearly three-quarter-billion dollar contractwith Bombardier to supply light-rail cars. Metrolinx said it had"concernsabout Bombardier's performance as there have been significant quality and manufacturing issues."

Meanwhile,30 new Bombardier streetcars in Toronto are experiencing mechanical problems more often than expected, according to a report tabled lastweek.

The mechanical problems includedoors that don'topen properly, brake issues and intercom systemsthat don'twork.

Bombardier refused an interview request Monday from CBC Montreal, directing questions instead to consortium partner,Alstom.

They rejected the suggestion there was a design problem with the AZUR cars.

"This is not an AZUR issue as the MR73 trains also have damaged equipment. Furthermore, the AZUR train's design has been validated by the STM, respects the STM's technical specifications, and the AZUR trains have travelled thousands of kilometreswithout any problems," Alstom said in a statement.

With files from CBC's Homerun