Home | WebMail | Register or Login

      Calgary | Regions | Local Traffic Report | Advertise on Action News | Contact

North

Yukon's Eagle Gold mine site gets energized

Victoria Gold's Eagle gold mine near Mayo is now connected to Yukon Energy's power grid. The mine is expected to be in operation later this year.

Victoria Gold's mine near Mayo now connected to Yukon Energy power grid

Yukon Energy flipped the switch to Victoria Gold's Eagle Gold project, near Mayo, late last week. (Victoria Gold Corporation )

Yukon's newest mine project has reached a milestone it's nowconnected to the territory's electrical grid.

Yukon Energy flipped the switch to Victoria Gold's Eagle Gold project, near Mayo, late last week. The mine is expected to open later this year.

John McConnell, president of Victoria Gold, says it's win-winfor his company and Yukon Energy.

"You knowwith the Minto Mine shutting down, they had no commercial customers any longer so this is a big deal for Yukon Energy as well," he said.

Yukon Energy says power sales to Victoria Gold are estimated to bring in$100 million in revenues or more, over the expected life of the mine.

Andrew Hall, president of Yukon Energy, says thatcouldbenefit other customers.

"Power prices are going to go up with inflation and as we build more assets. What the Victoria Gold sales means for us is maybe that increase won't be as high as it normally would be," said Hall.

Victoria Gold covered the full cost of connecting its mine site to the main power grid. McConnell says the site alsohas a large diesel generator, and itsown substation.

Victoria Gold also recently installed a $10.5 million diesel power plant at the Eagle site. (Victoria Gold Corporation)

"We built our own power plant on site, it's just under five megawatts of capacity," he said.

He says the total cost of thepower plant infrastructure at the Eagle project was $10.5 million. It will be used asemergency backup, in case ofa Yukon Energy power failure.

Construction of the mine is about90 per cent complete, and there are now more than 400 workers on site, according to McConnell.

He expects to pour some of the first gold bars from the Eagle site this summer.