Traffic Bridge demolition in Saskatoon goes off with resounding boom - Action News
Home WebMail Tuesday, November 19, 2024, 11:15 PM | Calgary | -8.9°C | Regions Advertise Login | Our platform is in maintenance mode. Some URLs may not be available. |
SaskatoonVideo

Traffic Bridge demolition in Saskatoon goes off with resounding boom

Explosive charges strategically placed on the old Traffic Bridge in Saskatoon blew up portions of the structure at 9 a.m. CST Sunday in the first phase of its demolition.

Bridge spanning South Saskatchewan River was more than 100 years old

Saskatoon Traffic Bridge partial demolition

9 years ago
Duration 1:04
The city's iconic Traffic Bridge is partially demolished with explosive charges.

Thousands of people lined the Broadway Bridge in Saskatoon Sunday morningto watch as explosive charges on the old Traffic Bridge in Saskatoon blew off two of its sections.

The first phase of the Traffic Bridge's demolition started with a bang shortly after 9 a.m. CST.

The bridge, which has been closed since 2010, is over 100 years old.

The tear-down of the structure will continue through the winter, with a new bridge set for completion in 2018. The city says construction is expected tobegin this summer, once debris from the demolished bridge is collected from the South Saskatchewan River.

Three minutes before the blast, a series of short sirens signalled that the explosive charges were ready to detonate.

Explosive charges ignite and separate two sections of the Saskatoon Traffic Bridge from its piers. (Albert Couillard/Radio-Canada)

The blastwas a quick, but loud one. The soundreverberated throughout the downtown area.

The bridge's two southern sections were immediately separated from its piers, and came crashing down onto the temporaryberm built below the bridge.

The impact sent out a huge plume of smoke that slowly dissipated.

The two bridge sectionswilleventuallybe hauled away for recycling.

Explosive charges separate two sections of the Traffic Bridge in Saskatoon from its piers. (Albert Couillard/Radio-Canada)

Viewing from Broadway Bridge

A large mass of people gathered on the city's Broadway Bridge to take in the spectacle.

By 8:50 a.m., families, kids and afew pet dogs waited eagerly. The west sidewalk of the bridge was crammed with people bundled tightly inthe biting cold:23 C that felt like30 in the wind.

People hoping for a good vantage point stood on the concrete barrier separating the roadway from the sidewalk.

The two southern sections of Saskatoon's Traffic Bridge fall onto a berm after they were separated from the bridge's piers using explosive charges. (Albert Couillard/Radio-Canada)

Along with the spectators, there were about a dozen videographers and photographers withtheir lenses trained on the demolition site, hoping to record a piece of the city's history.

Long history

The Traffic Bridge, also known as the Victoria Bridge, was closed in August 2010 due to public safety concerns.

It opened onOct.10, 1907 when it became Saskatoon's first bridge for foot and vehicle traffic. According to city notes on the history of the bridge, it was built at the insistence of the people of what was then a separate community Nutana who wanted a better way across the river than the existing ferry.

The promise of the bridge led to Nutana's agreement to join with the west side communities of Saskatoon and Riversdale to form the City of Saskatoon in 1906.

The bridge was built at the cost of $106,000 and was paid for by the provincial government.

A plume of smoke shoots out from the berm after Saskatoon's Traffic Bridge falls onto it. (Albert Couillard/Radio-Canada)