Home | WebMail | Register or Login

      Calgary | Regions | Local Traffic Report | Advertise on Action News | Contact

Toronto

Eglinton Crosstown construction zone an 'unsafe situation,' say condo staff, residents

Multiple residents of 1750 Bayview Avenue told CBC Toronto they have been dealing with various possible safety issues stemming from the ongoing construction, including reduced visibility for drivers and pedestrians outside the condo, a narrowed driveway, and changes in pedestrian routes.

Reduced visibility, narrowed driveway among safety concerns of 1750 Bayview Avenue residents

Condo board president Norma Fisher, left, and property manager Lyndsey McNally have safety concerns about the ongoing Eglinton Crosstown LRT construction that surrounds the condo building at Bayview and Eglinton avenues. (Lauren Pelley/CBC News)

Sitting in a common area at her midtown Toronto condo, Norma Fisher plays a video on her laptop. It's from her car's dash cam, pointed out the driver's side window,showingher regular drive out of the condo parking lot pasthoarding, "danger" signs, and pylons.

According to Fisher the condo board president for the buildingat Bayview and Eglinton avenues it's a potentially dangerous stretch, allthanks to ongoing Eglinton Crosstown LRT construction. "You really can only see the cars just as they're coming to our driveway," she said.

And for three years, that's just been one of Fisher's safety concerns.

Residentsof the low-riseat 1750 Bayview Avenue told CBC Toronto they have been dealing with various possible safety issues stemming from the ongoing construction, including reduced visibilityfor drivers and pedestrians outside the condo, a narrowed driveway, and changes topedestrian routes.

The residents also expressed concern thatMetrolinx, the provincial agency building the LRTroute,isn't doing enough to mitigate their concerns in a timely manner.

"It was a problem back in 2015, it's a problem now," Fisher said. "We just can't get a resolution."

Hoarding and warning signs are out front of the condo building at 1750 Bayview Avenue. (Ed Middleton/CBC News)

Narrowed driveway an 'unsafe situation'

Property manager LyndseyMcNallyis among those worried about safety issues stemming from construction of theEglintonCrosstownLRTline, which will be a 19-kilometre, partially-undergroundroute when it's completed in 2021.

On a walk around the low-rise condo building, she pointed out multiple concernsthe building's staff haveflagged to Metrolinx over the past few years. The driveway area, narrowed by fencing and equipment, is an "unsafe situation" where both drivers and pedestrians can't properly see oncoming traffic, she said.

While she acknowledged that Metrolinx has provided workers to direct traffic, she said that's only during working hours not when construction has stopped for the day.

McNallyalso expressed concern that the construction forces thebuilding's residents to take a winding route to exit the building. "We do have a higher population of elderly residents, and some of them have disabilities," she said, adding those residents now have a more difficult, extended walk just to get to the grocery store across the street.

Ward 22 Coun. Josh Matlowsaid residents in his area, including those at1750BayviewAvenue, are living on the "front lines" of the LRT construction.

"Every time they reach out to Metrolinx to mitigate those impacts to help them out ... there's a lot of promises," he added. "I do know that the residents in that building are increasingly frustrated with the kind of response they've received from Metrolinx."

The Eglinton Crosstown LRT line will be a 19-kilometre, partially-underground route when it's completed in 2021. (Ed Middleton/CBC News)

'We respond to every email, every concern'

Fisher and McNally said the agency has been responsive through thousands of back-and-forth emails, and has made changes to construction set-ups over the years,such as removing a wooden panel on a fenced pedestrian walkway to increase visibility.

But both feel the solutions are typically reactive, not proactive steps to ensure safety something the residents find alarming with several more years of construction still ahead.

Metrolinx, however, said it has made ongoing efforts to speak to residents and provide information about construction work in advance, including the potential impacts.

"We do have regular communication with them, regular meetings with folks;we respond to every email, every concern, very, very quickly," saidJamie Robinson,director of community relations and communications for Metrolinx's rapid transit projects.

Robinson said the agencyis doing "everything possible" to minimize disruptions, including having adequate signageandbringing in health and safety experts to look at the construction sites.

Still, Fisher feelsmore could be done to ensure driver and pedestrian safety in the traffic-heavy area.

"That's all we're asking: Make this environment safer," she said."We didn't make this situation Metrolinxmade this situation."